We – EPG Team the largest gearbox & motors , couplings and gears manufacturing facility in China with 5 different branches. For far more specifics: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Founded in 1992, HangZhou Lanhang Machinery Co., Ltd. is a personal enterprise integrating scientific investigation, manufacturing, advertising and services of plastic machinery into one full complete. Soon after 10 several years of challenging operate and continued attempts to enhance solution quality, we passed ISO9001 certification for our products.
Our “Lanhang” manufacturer of planetary roll extruders, straining extruders, powerful horsepower dense mixers, mixing rolls, and substantial-speed mixers are the spine of our firm.
Item Description
one) Application
Employed for plastic plasticizing, calendering and pressing.
2)Principal techinical parameter
ProjectModel | SK400*1000 | SK450*1200 | SK560*1830 | SK610*2030 | SK660*2300 | SK760*2800 |
Front/back again roll diameter(mm) | 400 | 450 | 560 | 610 | 660 | 760 |
Wor ept size(mm) | a thousand | 1200 | 1830 | 2030 | 2300 | 2800 |
Principal motor power(kw) | forty five | 55 | seventy five | ninety | 132 | 220 |
Reucer speed box | Hard toothed | |||||
Kind of push | Cardan shaft |
3) machine record
No. | Merchandise | Quantity |
one | Roller | 2 pc |
2 | Temperature controlling device | 2 set |
3 | Machine bed | 1 set |
four | Nip adjusting device | 1 set |
five | Blocking device | 1 set |
six | Cutting device | 1 set |
seven | Stock pan | 1 set |
8 | Speed reducer | 1 set |
nine | Reducer lubricating system | 2 set |
ten | Emergency brake, safety device | 2 set |
eleven | Control system | 1 set |
twelve | Main motor | 2 set |
Packaging & Shipping
1. Payment: 30% by T/T as down payment money, balance (70%) by T/T before shipment.
two. Lead Time: 90 working days after receiving the down payment money.
three. Package: PE film, pallet at the bottom (if necessary).
Our Companies
1. Warranty period: From the day of the use of the machine in the buyer’s factory:
(1) The mechanical Parts: 12 months
(2)The electrical Parts: 6 months
2. Installations and Commissioning
(1)Up to date commissioning has been made before shipment
(2)Overseas Commissioning and charges:
0ne or two technicians will be sent to the buyer to guide the installation and commissioning of thequipment if the customer requests.
Customers pay the charge of our technicians.
1) Round-trip Airplane Tickets
2) Charges of transportation, accommodation and communication
3) The allowance of the technicians is USD 100 per day for one person.
4) An interpreter is needed.
3 English manual, Figuration drawing, and footing drawings are provided
The use of first products manufacturer’s (OEM) portion numbers or logos , e.g. CASE® and John Deere® are for reference reasons only and for indicating product use and compatibility. Our firm and the outlined substitute areas contained herein are not sponsored, accepted, or created by the OEM.